Price Offer Disclaimers
- The price offers does not include the cost of foundation works.
- The price offers does not include the costs of special works (water, heating, sewerage, ventilation and electricity).
- The price offers does not include the cost of interior finishing works and materials.
- The price offers does not include staircases, stairway landings and staircase banisters.
- The price offers does not include additional items for the roof like roof outlets and roof security features.
- The price offers does not include the chimneys and fireplaces.
- All the paints used are water-based. No other based-paints are taken into consideration.
- Q-haus Baltic OÜ cannot be a legally responsible Designer and Executor in the Country of destination.
- Heat loss calculation shall be made by the Customer.
- Q-haus will not take any responsibility for meeting the building regulations and norms in destination country, in case additional insulation and finishing materials/layers are meant to be installed by the customer on top of Q-haus elements, which are not described in price offers.
- Special sound and fire requirements are not taken into account. If there are any requirements that are not seen on the drawings, this must be accounted and described separately.
- No additional materials or measures for special environmental loads (for example seismic loads) have been taken into account in the present offer.
- Customer shall provide surveillance, water and electricity existence during the period of construction works on the construction site. Price offers does not include the cost of water and electricity on site.
- Customer shall provide trash/waste container and disposal of waste whenever the container is full.
- Customer shall provide storage lockable container and toilet on construction site.
- Customer shall provide the access to the construction site. Roads to the construction site must be accessible with 13,5m trailer (with total weight of 30t).
- Customer shall install heaters and dehumidifiers into every storey of the house right after the assembly works are finished and be sure the moisture level inside the timber isn’t over 12% before installing internal gypsum and starting with the interior finishing works.
- Price offers does not include VAT or any other taxes in the Country of destination.
- Only parts, elements, materials and works that are listed in current price offer are included in the scope of Q-haus. Parts, elements, materials and works that are not listed in current price offer, are NOT calculated in the price budget and will be considered as extras.
Last update: 05.03.2018